The Beijing National Stadium, also known as the bird's nest will be the main track and field stadium for the 2008 Summer Olympics and will be host to the Opening and Closing ceremonies. In 2002 Government officials engaged architects worldwide in a design competition. Pritzker Prize-winning architects Herzog & de Meuron collaborated with ArupSport and China Architecture Design & Research Group to win the competition. The stadium will seat as many as 100000 spectators during the Olympics, but this will be reduced to 80000 after the games. It has replaced the original intended venue of the Guangdong Olympic Stadium. The stadium is 330 metres long by 220 metres wide, and is 69.2 metres tall. The 250000 square metre (gross floor area) stadium is to be built with 36 km of unwrapped steel, with a combined weight of 45000 tonnes. The stadium will cost up to 3.5 billion yuan (422873850 USD/ 325395593 EUR). The ground was broken in December 2003, and construction started in March 2004, but was halted by the high construction cost in August 2004. In the new design, the roof of the stadium had been omitted from the design. Experts say that this will make the stadium safer, whilst reducing construction costs. The construction of the Olympic buildings will continue once again in the beginning of 2005. In depth The stadium's appearance is one of synergy, with no distinction made between the facade and the superstructure. The structural elements mutually support each other and converge ...
Sources:
Beijing National StadiumBirds NestOlympic StadiumBeijing National StadiumBirds NestOlympic Stadium
ไม่มีความคิดเห็น:
แสดงความคิดเห็น